ECO ENERGY PLANT New Generation
Recycles 100% of all carbon-containing waste, without incineration and without emissions of harmful substances into the environment!
Recycles 100% of all carbon-containing waste, without incineration and without emissions of harmful substances into the environment!
The project was developed with the participation of the international organization Deloitte "Big 4". And also with the support of National Company "Kazakh Invest" JSC.
www2.deloitte.com"Clean Planet Corporation" PLC (hereinafter referred to as "CPC Holding"), plans to build a Pilot innovative "Waste Processing Eco Energy Plant" on the territory of the "TARAZ Industrial Zone" in the city of Taraz, Republic of Kazakhstan. The annual processing capacity is up to 100,000 tons of MSW per year. The plant is scheduled to be put into operation in Q2 2025, reaching its design capacity in Q4 2025.
The project operator is "Eco Energy Plant" LLP (hereinafter - "EEP"), a 100% subsidiary of CPI Holding. For the construction of the facility, a land plot of 10.5 hectares was allocated on the territory of the "TARAZ Industrial Zone" for a period of 20 years, until 2043. An agreement was also concluded with the Akimat of the city of Taraz for the provision and supply of solid waste for a period of 15 years, which guarantees the uninterrupted operation of production.
TARAZ - is a developing city in the south of Kazakhstan with a 2000-year history on the great Silk Road, whose population "produces" more than 100,000 tons of solid waste per year and its active growth will provide enough solid waste to fully load the plant's capacities. The project is being implemented with the full support of the leadership of the Zhambyl region and the city of Taraz.
Waste recycling is a gasification process in which 80% organic carbonaceous materials such as: all kinds of plastic, rubber, dough, paper,leather, bones,food waste, etc.,
When processing 75,000 tons of carbonaceous waste per year, we get 40,000,000 m3 of synthesis gas and 14,000 tons of coke.
The vegetarian menu included gazpacho, piquant julienne beets, rusk rounds with yogurt, and excellent flan. William said that everything about his jacket was in quite good condition except for the zipper. No kidding, Lorenzo called off his trip to visit Mexico City just because they told him the conquistadores were extinct.
William said that everything about his jacket was in quite good condition except for the zipper. The vegetarian menu included gazpacho, piquant julienne beets, rusk rounds with yogurt, and excellent flan.
The vegetarian menu included gazpacho, piquant julienne beets, rusk rounds with yogurt, and excellent flan. William said that everything about his jacket was in quite good condition except for the zipper. No kidding, Lorenzo called off his trip to visit Mexico City just because they told him the conquistadores were extinct.
1231 William said dsada that everything about his jacket was in quite good condition except for the zipper. The vegetarian menu included gazpacho, piquant julienne beets, rusk rounds with yogurt, and excellent flan.
CPC Holding is holding a closed sale of the company's common shares.
Purpose of the sale: Financial security for the application to participate in the 2024 RES auction, to obtain an "offtake" contract for the purchase of electric energy from RFC LLP of KEGOC JSC.
The main financing for the construction of the plant is planned to be attracted from private investors, by issuing "green bonds" on the AIX (AIFC) exchange, as well as a long-term "green" loan from the Investment Bank. The cost of the pilot project is 18.4 billion tenge or 40,000,000 US dollars.
Juristic documents
Agreements
Business plans
Intellectual property